Umahi stated this on Sunday during an inspection of bridges on Sections 1 and 2 of the Coastal Highway, where he assured that President Tinubu has directed that the project be completed as envisaged.
“Nothing will happen to the 750-kilometre Lagos-Calabar Coastal Highway, which passes through the nine coastal states. The President has directed that the project must be completed as envisaged,” he declared.
“We are also using solar instead of conventional electricity; we are entitled to carbon credits,” he said, adding that the superhighway would also accommodate tourism facilities, factories, CCTV surveillance and other commercial infrastructure.
The Minister disclosed that the official commissioning of Section 1 by President Tinubu is expected this month or early December.
He also described the ongoing 1068-kilometre Sokoto-Badagry Road as another major infrastructure undertaking of the administration.
He also clarified that the reconstruction of the East-West Road is an additional commitment by President Tinubu and does not replace or affect the Lagos-Calabar Coastal Highway, stressing that the President is pursuing multiple major infrastructure projects simultaneously across the country.
Umahi commended Tinubu for the scale of infrastructure development and economic reforms, citing declining inflation, improved foreign exchange access for businesses and the absence of ASUU strikes as developments Nigerians should appreciate.
He urged Nigerians, particularly South-East residents in Lagos, to support the President, noting that the administration has delivered significant infrastructure projects to the region.
The Minister disclosed that he had ordered a three-week nationwide emergency rehabilitation of major federal highways ahead of the festive season and the January 2027 elections, directing Zonal Directors, Controllers, Resident Engineers and contractors to return to the field immediately to ensure that critical roads are made motorable.
The intervention covers major highways across all six geopolitical zones.
Umahi warned that contractors must not allow motorists to suffer on failed sections while permanent construction continues, directing that damaged portions be excavated and rehabilitated using appropriate materials and asphalt where necessary.
“I feel so sad that a contractor will be on site doing permanent work, yet some sections of the roads remain impassable. This practice must stop,” he said.
He directed officials to document the rehabilitation exercise, engage contractors, report challenges promptly and ensure that roads are restored to acceptable motorable conditions within the three-week period.
The Minister stressed that the intervention is aimed at easing movement during the festive season, facilitating the transportation of goods and services, supporting the movement of election materials and strengthening security operations ahead of the 2027 elections.
He urged Ministry officials to demonstrate commitment and sacrifice, insisting that the nationwide assignment must be treated with urgency.






